History

Back to Ship

                                    History

LOI
12/1989 Building contract
Building started
Keel laid
28/3/1990 Launch
Sea trial
Second sea trial
19/4/1990 Delivered to City Jet Line AB, Vaxholm, Sweden.
27/4/1990 Operate on Stockholm archipelago.
1992Sold to Rederi AB Slite, Waxholm, Sweden.
1993Sold to Ångfartygs Ab Strömma Kanal
1994New name Cinderella 1.
1/9/1999 Hit a bridge when lost hydraulic system, then drifted
to beach. No any injures.
22/5/2002 Departured cancelled due to main engine problems.
2004Rebuild on Anytech Marine AB, Öregrund
1/12/2021Sold to Hartford Rederi Ab, Häljarp, Sweden.
15/3/2022Drydocking at Simrishamn. New name Tilda.
2022Helsingborg – Ven service and cruises. Operated Öresund Cruise Line.