History
LOI | |
31/1/1980 | Building contract |
Building started | |
12/6/1980 | Keel laid |
Launch | |
Sea trial | |
Second sea trial | |
1/9/1981 | Delivered to Moby Lines, Cagliari, Italy |
11/1981 | Piombino – Portoferraio route |
6/1982 | Piombino – Palau route. |
Santa Teresa – Bonifacio route. | |
11/4/2016 | Run aground when departed from Santa Teresa. |
22/8/2016 | Extra dry docking due to hydraulic problems. |
25/4/2017 | Engine failure and collision caused to that. |
2/5/2017 | Engine problems. |
6/2/2020 | Grounded at Galluraport, Sardinia. Have 8 meter long gash in hull. |