History
| LOI | |
| 31/1/1980 | Building contract |
| Building started | |
| 12/6/1980 | Keel laid |
| Launch | |
| Sea trial | |
| Second sea trial | |
| 1/9/1981 | Delivered to Moby Lines, Cagliari, Italy |
| 11/1981 | Piombino – Portoferraio route |
| 6/1982 | Piombino – Palau route. |
| Santa Teresa – Bonifacio route. | |
| 11/4/2016 | Run aground when departed from Santa Teresa. |
| 22/8/2016 | Extra dry docking due to hydraulic problems. |
| 25/4/2017 | Engine failure and collision caused to that. |
| 2/5/2017 | Engine problems. |
| 6/2/2020 | Grounded at Galluraport, Sardinia. Have 8 meter long gash in hull. |