History

Back to Ship

                                    History

LOI
31/1/1980Building contract
Building started
12/6/1980Keel laid
Launch
Sea trial
Second sea trial
1/9/1981Delivered to Moby Lines, Cagliari, Italy
11/1981Piombino – Portoferraio route
6/1982Piombino – Palau route.
Santa Teresa – Bonifacio route.
11/4/2016Run aground when departed from Santa Teresa.
22/8/2016Extra dry docking due to hydraulic problems.
25/4/2017Engine failure and collision caused to that.
2/5/2017Engine problems.
6/2/2020Grounded at Galluraport, Sardinia. Have 8 meter long gash in hull.