History

Back to Ship

                                    History

LOI
3/4/2003Building contract
Building started
3/3/2004Keel laid
29/8/2004Launch
Sea trial
Second sea trial
7/3/2005Delivered to Tirrenia di Navigazione, Napoli, Italy
3/2005Olbia – Civitavecchia and Genova – Porto Torres routes
4/2/2012Hit a breakwater in Civittaveccia and got 25 meter long hole in hull.
2012Repaired
13/7/2016Collision with m/s Excelsior in Genova