History

Back to Ship

                                    History

11/1/2019LOI
21/1/2019Building contract
16/9/2019Building started
  
 13/2/2020Keel laid
 11/9/2020Launch
 6-9/6/2021Sea trial
 Second sea trial
30/4/2021Planned delivery. Delayed due to Covid.
 25/8/2021 Delivered to Kvarken Link Ltd, Vaasa, Finland
  
28/8/2021 Vaasa – Umeå route operated Wasa Line.
 31/12/23-5/1/2024 Drydocking at Klaipeda
 24/12/25-10/1/2026 Drydocking at Naantali Repairing yard.
 1/2026 Stena Line strengthens its position in the Baltic Sea by acquiring NLC Ferry Ab Oy/Wasaline and taking over the operations of the ferry route between Vaasa in Finland and Umeå in Sweden.