History

Back to Ship

                                    History

 LOI
 Building contract
 Building started
  
30/11/2006Keel laid
29/8/2007Launch
 Sea trial
 Second sea trial
16/6/2008Delivered to HAL Antillen NV, Rotterdam, Netherlands
1/7/2008Christened by Queen Beatrix of the Netherlands
  
  
  
 4/4/2011 Drydocking at Freeport.
  
  
  
20/12/2015 14 days drydocking at Freeport. Refurbished interior.