History
| LOI | |
| Building contract | |
| Building started | |
| Keel laid | |
| 8/7/2020 | Launch |
| 9/7/2020 | Sea trial |
| Second sea trial | |
| 14/7/2020 | Delivered to Rederi Ab Ballerina, Stockholm, Sweden. |
| 22/7/2020 | Route 80 Nybroplan – Nacka Strand – Larsberg – Ropsten. |
| LOI | |
| Building contract | |
| Building started | |
| Keel laid | |
| 8/7/2020 | Launch |
| 9/7/2020 | Sea trial |
| Second sea trial | |
| 14/7/2020 | Delivered to Rederi Ab Ballerina, Stockholm, Sweden. |
| 22/7/2020 | Route 80 Nybroplan – Nacka Strand – Larsberg – Ropsten. |